WageBid home

How to price a facility support contract

A staffing plan across several SCA classes under one WD: a burdened rate per code, a blended rate and option years.

A facility or base support contract puts maintenance trades, general maintenance workers and office staff under one Service Contract Act wage determination. Each position has its own WD rate, and often its own workers' comp class. The price is the sum of a staffing plan, not one rate times hours.

This guide builds that plan in order: positions, classes, a burdened rate per code, a blended rate, and option years. The worked example uses WD 2015-5233 rev 35 for Harris County, Texas, and the same assumptions as our burdened labor rate guide, except workers' comp, which differs by position.

1. Build the staffing plan from the PWS

Some solicitations state a minimum staffing level. Most performance-based ones do not, and you build the plan from the workload:

Coverage changes the head count. A full-time employee with eleven holidays and two weeks of vacation is paid for 2,080 hours but works 1,912. A desk that must be staffed 2,080 hours a year needs 2,080 ÷ 1,912 = 1.09 FTEs, or another employee who can cover it. Write each FTE count down as an assumption with the workload behind it.

2. Map every position to a class on the WD

Each service employee must be paid at least the WD wage and receive the WD fringe benefits for the class of work performed (FAR 52.222-41(c)(1)). Common facility classes on WD 2015-5233 rev 35:

CodeOccupationRate
23370General Maintenance Worker$22.46
23580Maintenance Trades Helper$18.01
23130Carpenter, Maintenance$23.88
23160Electrician, Maintenance$28.61
23410HVAC Mechanic$28.34
23760Painter, Maintenance$22.18
23810Plumber, Maintenance$29.47
23510Locksmith$23.53
01300Scheduler, Maintenance$22.48
01112General Clerk II$19.41
01311Secretary I$22.48

The WD lists code 23410 as Heating, Ventilation and Air-Conditioning Mechanic. Each class has the duties described in the SCA Directory of Occupations. Three rules decide how you price the edges of the plan:

3. Watch for construction inside the contract

Facility support often includes repair and alteration work. Construction wage rates (Davis-Bacon) apply to construction work in a service contract when it is on a public building or public work, the contract has specific requirements for a substantial amount of it above the statute's threshold, and it is physically or functionally separate from the other work (FAR 22.402(b)(1)). They do not apply when the construction is incidental, or so merged or fragmented that it cannot be segregated (FAR 22.402(b)(2)). If the solicitation includes a construction WD, price those tasks on it. See SCA vs Davis-Bacon.

4. One burdened rate per code

Run the same build for every code: wage with PTO uplift, H&W, payroll taxes, workers' comp, then overhead, G&A and fee. What changes from code to code:

What stays the same: H&W is a flat dollar amount per hour paid, up to 40 a week and 2,080 a year (29 CFR 4.175(a)(1)). For 2026 it is $5.92, or $5.42 on contracts covered by EO 13706, effective August 10, 2026; Hawaii's rates are $2.51 and $2.01. FUTA and SUTA are flat dollars per employee once wages pass the wage base. Both are a bigger share of the rate for a clerk than for a plumber.

5. The blended rate, and how to use it

Blended rate = total labor price ÷ total productive hours
Weight every code by its hours, never a simple average of rates

A blended rate is a check, not a pricing method. Use it to compare your bid with past bids and with the incumbent's price, if it is public. Do not price a different staffing mix with it: the blend is only true for the plan it came from.

Worked example: a nine-person plan in Harris County

Assumptions: nine full-time employees on WD 2015-5233 rev 35, each at the WD minimum. Standard H&W of $5.92, paid into a health plan; not covered by EO 13706. Eleven holidays and two weeks of vacation for everyone, so 1,912 productive hours each. SUTA 2.7% on a $9,000 wage base. Workers' comp 4.00% of payroll for trades and 0.50% for office staff. Overhead 10%, G&A 8% and fee 6%. Parts and materials $30,000 a year, with G&A and fee. Replace every assumption with your own.

One code, line by line: General Maintenance Worker

StepMathValue
Wage per productive hour$22.46 × 2,080 ÷ 1,912$24.43
H&W per productive hour$5.92 × 2,080 ÷ 1,912$6.44
Annual wages$22.46 × 2,080$46,716.80
FICA7.65% × $46,716.80$3,573.84
FUTA0.6% × $7,000$42.00
SUTA2.7% × $9,000$243.00
Workers' comp4.00% × $46,716.80$1,868.67
Taxes and insurance per productive hour$5,727.51 ÷ 1,912$3.00
Direct labor cost$24.43 + $6.44 + $3.00$33.87
Overhead10% × $33.87$3.39
G&A8% × $37.26$2.98
Fee6% × $40.24$2.41
Bill rate per productive hour$42.65

Every code in the plan

PositionWD wageBill rate
General Maintenance Worker (23370)$22.46$42.65
HVAC Mechanic (23410)$28.34$51.64
Electrician, Maintenance (23160)$28.61$52.05
Plumber, Maintenance (23810)$29.47$53.37
Maintenance Trades Helper (23580)$18.01$35.84
Scheduler, Maintenance (01300)$22.48$41.61
General Clerk II (01112)$19.41$37.06

The scheduler earns 2 cents an hour more than a general maintenance worker but bills $1.04 less, because of the lower workers' comp rate. That is why each code gets its own build.

Staffing plan and annual price

StepMathValue
General Maintenance Workers, 35,736 × $42.65$244,640.40
HVAC Mechanic1,912 × $51.64$98,735.68
Electrician1,912 × $52.05$99,519.60
Plumber1,912 × $53.37$102,043.44
Trades Helper1,912 × $35.84$68,526.08
Scheduler1,912 × $41.61$79,558.32
General Clerk II1,912 × $37.06$70,858.72
Labor, 9 FTEs17,208 hours$763,882.24
Blended rateLabor ÷ 17,208$44.39
Parts and materialsAssumed$30,000.00
G&A on materials8% × $30,000$2,400.00
Fee on materials6% × $32,400$1,944.00
Annual price, base yearLabor + materials$798,226.24

Values are rounded to the cent at each step. A simple average of the seven bill rates is $44.89. Priced over 17,208 hours, that is $772,467.12, or $8,584.88 more than the plan, because it gives the one plumber the same weight as the three general maintenance workers. On a different mix the error can go the other way.

Option years

FAR 52.222-43(b) makes you warrant that your prices include no allowance for the increases the clause adjusts for later. The adjustment covers wages and fringe benefits required by a new WD, plus the related social security, unemployment tax and workers' comp, but no overhead, G&A or profit (FAR 52.222-43(d) and (e)). So labor stays at $763,882.24 every year. Parts and materials are not covered by the clause; here they are assumed to rise 3% a year.

PeriodMaterialsAnnual price
Base year$30,000.00$798,226.24
Option year 1$30,900.00$799,256.56
Option year 2$31,827.00$800,317.79
Option year 3$32,781.81$801,410.85
Option year 4$33,765.26$802,536.71
Five years$4,001,748.15

When a new WD raises the rates after award, file the adjustment on time. See FAR 52.222-43 price adjustment, step by step.

Checks before you submit

See every class on your WD

Look up the trades, maintenance and office rates on the WDs for your place of performance.

Open the free WD lookup

Every code, burdened the same way.

SCA Bid Pricing Pro runs this build for each position in your staffing plan, across the base and four option years, with checks that must read OK before you submit.

Sources

Last reviewed: November 2026. This guide is a pricing aid and general information, not legal or tax advice.